Company Quality Policy

  • 1
    Certificates
  • 2
    Quality assurance system for prefabrication

    The Quality Production Assurance Programme for prefabricated reinforcement elements for concrete in Stal-Service Sp. z o.o. covers the following issues and processes:

    1. GENERAL (INFORMATION) PART
    2. ORGANISATIONAL STRUCTURE AT STAL-SERVICE SP. Z O.O.
    3. DOCUMENT AND INFORMATION FLOW AT STAL-SERVICE SP. Z O.O.
    4. STAFF-REQUIREMENTS AND OBLIGATIONS
    5. MATERIAL FOR INSTALLATION
      1. Reinforcement in the form of cut and bent reinforcing steel
      2. Reinforcement in the form of a glass-polyester composite
      3. Fittings and auxiliary materials for installation
      4. Delivery and reception of materials for the assembly of a prefabricated element
    6. DEVICES/EQUIPMENT
    7. PROCESS SUPERVISION
      1. SUPERVISION OF PREPARATION FOR THE ASSEMBLY OF THE PREFABRICATED ELEMENT
      2. SUPERVISION OF THE INSTALLATION OF THE PREFABRICATED ELEMENT
      3. QUALITY MANAGER
    8. INSPECTIONS AND MEASUREMENTS DURING INSTALLATION
      1. Inspection and measurements of materials for making the prefabricated element
      2. Inspection and measurements of the prefabricated element
    9. INSTALLATION PROCESS
      1. Pre-installation operations
      2. Installation process
        1. Installation process of the prefabricated element from cut and bent reinforcing steel
        2. Installation process of the prefabricated glass-polyester composite
      3. Inspection and measurements of the prefabricated element
      4. Labelling, handling, and storing the prefabricated element
      5. Shipping the finished prefabricated element to the Customer
    10. Supervision of production and measuring equipment
    11. Handling of non-conforming products and complaints
    12. Complaints and corrective actions
    13. Archiving documentation
    14. Product (prefabricated element) quality assurance and supervision of the product (prefabricated element) quality control
  • 3
    Quality assurance system for reinforcement

    The Quality Assurance Programme for the production of reinforcement at Stal-Service Sp. z o.o. production plant comprises of the following steps:

    1. GENERAL (INFORMATION) PART
    2. ORGANISATIONAL STRUCTURE AT STAL-SERVICE SP. Z O.O. PRODUCTION PLANT
    3. DOCUMENT CIRCULATION AND INFORMATION FLOW CONCERNING THE REINFORCEMENT PRODUCTION STAGES AT STAL-SERVICE SP. Z O.O. PRODUCTION PLANT
    4. STAFF-REQUIREMENTS AND OBLIGATIONS
    5. PRODUCTION (TECHNOLOGICAL) PROCESSES USED IN STAL-SERVICE SP. Z O.O. PRODUCTION PLANT
    6. PRODUCTION MACHINERY AND EQUIPMENT
    7. SUPERVISION OF THE PRODUCTION OF REINFORCEMENT
    8. IDENTIFICATION OF THE STEEL APPROVED FOR THE PRODUCTION OF REINFORCEMENT
    9. INSPECTION AND MEASUREMENTS CARRIED OUT AT THE REINFORCEMENT PRODUCTION STAGES.
      1. Acceptance control of steel for the production of reinforcement and measurements.
      2. Inspection and measurements of reinforcement.
    10. REINFORCEMENT PRODUCTION STAGES
      1. Approval of reinforcing steel for production
      2. Activities prior to the preparation of reinforcement production.
      3. Preparation of reinforcement production
      4. Production process and inspection of finished products
      5. Labelling, handling, and storing
      6. Forwarding of finished reinforcement to the Customer
      7. Supervision of production and measuring equipment
      8. Handling non-conforming products and complaints
      9. Complaints and corrective actions
      10. Archiving of the documentation
    11. EXTRACT FROM THE QUALITY MANUAL ON THE COURSE OF THE PROCESSES REFERRED TO IN THIS QUALITY ASSURANCE PROCESS MANAGEMENT.
  • 4
    General terms and conditions of sale and delivery

    General terms and conditions of sale and delivery

Production Plant
Strużańska 30, 05-126 Nieporęt
(+48) 22 772 50 25
biuro@stalservice.com.pl
Sales Department